This project serves as a preliminary phase to the forthcoming Highway 400 – Highway 404 Link (Bradford Bypass) project. Situated between Bradford West Gwillimbury 8th Line and 9th Line in the Town of Bradford West Gwillimbury, County of Simcoe, its main goal is to support the County’s initiative to expand County Road 4 according to the 2012 approved Environmental Assessment (EA) and make provision for the grade separation between this road and the Bradford Bypass.

Key Elements of the Early Works Project include the following:

  • Construction of a new Underpass Structure over the prospective Bradford Bypass route.
  • Expansion of County Road 4 from a two-lane to a four-lane structure.
  • Multi-use Path: Development of a 3.0 m wide path on County Road 4’s east side.
  • Future Interchange Provisions: Design considerations for the eventual Bradford Bypass and related ramps, ensuring minimal future reconstruction on County Road 4.

Engtec Consulting Inc. acted as the High Complexity Pavement Designer and the QC/QVE for the project works.  The estimated construction value of this project is $30 Million.

3
LET’S CREATE TOGETHER, LET’S CREATE FUTURE!
This is a direct result of the dedicated service level that is maintained for all projects irrespective of their value.
logo_footer
At Engtec Consulting Inc. the experience and technical expertise that are available are second to none in the consulting industry. This is a direct result of the dedicated service level that is maintained for all projects irrespective of their value.

© 2024 Engtec Consulting Inc. Powered by <CS>