The Highway 427 Expansion project is a $450 million construction project funded by Infrastructure Ontario that includes the design and construction of the following:
- A new 6.6 km extension from Highway 7 to Major Mackenzie Drive including the following:
- Eight (8) lanes from Highway 7 to Rutherford Road;
- Six (6) lanes from Rutherford Road to Major Mackenzie Drive;
- Three (3) new interchanges (Langstaff Road, Rutherford Road and Major Mackenzie Drive);
- New median managed lanes.
A 4.0 km Road widening from Finch Avenue to Highway 7 including the following
- From six (6) to eight (8) lanes between Finch Avenue to south of Steeles Avenue;
- From four (4) to eight (8) lanes, from south of Steeles Avenue to Highway 7;
- New median managed lanes.
The contract includes a 30-year period, starting with the opening of the highway, during which Design Builder (Link427 cjv) will be responsible for the ongoing maintenance of the highway.
Engtec Consulting Inc. is providing Quality Verification Engineering (QVE) and Quality Control (QC) services on this project that includes installation preparing subgrade, installing granualr, storm line installation and backfill, hit-mix asphalt paving and central median tall wall installation.