The Highway 407 East Phase 2 project will extend Highway 407 about 22 km from Harmony Road in Oshawa to Highway 35/115 in Clarington. It will connect Highways 401 and 407 East with a 10-kilometre Highway 418 that will serve as a north-south freeway. The project will include eight new interchanges and three freeway-to-freeway connections (Highway 407 East and Highway 401 from Highway 418 and Highway 35/115). The project is in Durham Region, Ontario and will be constructed on a design, build, finance and maintain strategy. The total construction value of the project is $1.2 billion. The Highway 407 East Phase 2 will be a toll road and owned by the Ontario government. By late 2017, a portion of Highway 407 East Phase 2, from Harmony Road to Taunton/Highway 418 will be completed and the remaining portion was substantially completed in late 2019

Engtec Consulting Inc. has been retained on this project to develop the pavement structural designs by the successful consortium in accordance with current Ontario and Industry standards.

ourwork_highway407_3
about us
our works
LET’S CREATE TOGETHER, LET’S CREATE FUTURE!
This is a direct result of the dedicated service level that is maintained for all projects irrespective of their value.
logo_footer
At Engtec Consulting Inc. the experience and technical expertise that are available are second to none in the consulting industry. This is a direct result of the dedicated service level that is maintained for all projects irrespective of their value.

© 2024 Engtec Consulting Inc. Powered by <CS>