Hurontario LRT

news1

Hurontario LRT, which is a light rail transit line under construction in the cities of Mississauga and Brampton, Ontario, Canada.  The LRT line will run along Hurontario Street from Port Credit to Steels Avenue in Brampton.  The route is approximately 18 kilometers long and would feature dedicated LRT tracks.

The Hurontario-Main LRT aims to provide efficient, reliable, and sustainable transportation options for residents and commuters in Mississauga and Brampton. It is expected to improve connectivity, reduce travel times, and support future growth and development along the Hurontario corridor.

Mobilinx, a consortium of local and international companies, was awarded the contract to design, build, finance, operate and maintain the system.  The total contract value was approximately $5.6 billion. This included $4.6 billion to design, build and finance plus $1 billion to operate and maintain the line for 30 years.

Engtec is providing comprehensive and innovative engineering services for the construction of Hurontario LRT which began in fall of 2021.  With Engtec team of highly skilled engineers and technical professionals, Engtec provides a wide range of services to meet the diverse needs of the nature of this project requirements.  Our commitment to excellence, technical expertise, and client satisfaction sets us apart in the construction industry.

logo_footer
At Engtec Consulting Inc. the experience and technical expertise that are available are second to none in the consulting industry. This is a direct result of the dedicated service level that is maintained for all projects irrespective of their value.

© 2024 Engtec Consulting Inc. Powered by <CS>